Preparing a Post and Pier Base

 A Post and Pier Shed on a Slope  

 

 

 

 

 

Will cope with the steepest slopes, and involves building a timber deck on which to place the shed.

 Gravel for Drainage  

 

 

Dig a 300mm x 300mm hole to a depth of 600mm. 

 

Compact 100mm gravel for drainage [allows water to flow away quickly]. Pour concrete and finish at ground level.

 Metpost Concrete-In Post Support  

 

WONKEE DONKEE recommends using a Metpost Concrete-In post support, 100mm, or similar, which you set into the concrete, continually checking it is upright. Once the concrete has set, the post can be driven in.

     